General Capital Projects & Studies -- FY 2011-12
General Capital Projects & Studies Pages are published as PDF documents, which may be opened with Adobe Reader software. You may download the free Adobe Reader software if you do not already have it.
Table of Contents:
- General Capital Projects and Studies (Budget Page GC2)
- San Clemente Accessibility& Bayside Trail Improvements (Budget Page GC15)
- Tamalpais Accessibility Improvements (Budget Page GC17)
- Barrier Removal Implementation Project-Phase I (Budget Page GC19 )
- Emergency Storm Drainage Repairs (Budget Page GC21)
- Corrugated Metal Pipe Replacement (Budget Page GC23)
- Flood Control Infrastructure Management - GIS (Budget Page GC25)
- Raise/Repair Town Levees (Budget Page GC27)
- Flood Hazard Mailer (Budget Page GC29)
- Flood Control Improvements Design (Page GC31)
- Marina Village Flood Control Project (Budget Page GC33)
- Emergency Street Repairs (Budget Page GC35)
- Street Slurry Seals (Budget Page GC37)
- Street Overlays (Budget Page GC39)
- Pavement Management System (Budget Page GC41)
- Street Infrastructure - GIS (Budget Page GC43)
- Safe Pathways to School (Budget Page GC45)

